ATP production plant inspector checking refrigerated body insulation with thermal camera

Inspection of ATP Production Plants

Complex verification of organizational and technical conditions for manufacturers of insulated transport means and refrigeration units under the ATP Agreement.
AK 044
PCA accreditation
PJI-06
Inspection procedure
3 years
Certificate validity
80+ years
In HVACR

ATP manufacturing plant inspection

The COCH Inspection Body specialises in assessing manufacturing plants that produce products covered by the Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be Used for such Carriage (ATP).

Our mission is to ensure that products and means of transport meet the highest international safety and quality standards. Inspections are performed under PCA accreditation AK 044 (EN ISO/IEC 17020) in accordance with procedure PJI-06.

We support manufacturers in adapting to ATP Agreement requirements and in raising standards in the production and transport of perishable foodstuffs.

Who is the offer for?

Insulated means of transport

Manufacturers of thermally insulated vans, bodies, semi-trailers, trailers, containers and tanks covered by the ATP Agreement.

Cooling and heating units

Manufacturers of mechanical cooling and/or heating appliances, including refrigeration units used in thermally insulated means of transport.

Benefits of the inspection

Credibility

Independent assessment of product compliance with ATP Agreement requirements strengthens market trust.

Confirmation of compliance

Formal confirmation that manufactured products meet ATP requirements critical for safety and quality.

Confirmation of competence

PCA accreditation AK 044 confirms our competence and professional inspection practices.

Competitive advantage

Meeting international standards supports a stronger position on the refrigerated transport market.

Access to international markets

ATP conformity certificates open doors to international markets and business expansion.

Legal basis

Plant inspections are carried out in accordance with:

COCH PJI-06 procedure

Inspection of organizational and technical conditions of product manufacturing in accordance with the ATP Agreement — issue no. 1, dated 15.05.2024.

ATP Agreement

Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be Used for such Carriage (ATP).

What does the inspection cover?

Verification of organizational and technical conditions of plants manufacturing thermally insulated means of transport or mechanical cooling and/or heating appliances.

Organizational structure

Quality management system, supplier/subcontractor selection, product quality control, records/registers and employee qualifications.

Manufacturing process

Verification of production stages and process control for insulated transport equipment or refrigeration/heating units.

Production equipment

Assessment of manufacturing facilities, machinery and technical equipment used in production.

Measuring instruments

Supervision, metrology and calibration status of measuring instruments used in the plant.

Insulation materials & components

Insulation materials and specific technical components used in the manufactured products.

Production documentation

Manufacturing and assembly documentation against ATP and internal quality requirements.

Quality level & ATP conformity

Compliance of products with acceptable quality levels and with international ATP Agreement requirements.

Markings and data plates

Correct application of markings and data plates related to the ATP conformity assessment.

Repeatable production vs type-test protocols

Particular attention is paid to ensuring reproducible production of products in accordance with the specification of prototype test reports of means of transport or cooling/heating appliances.

How does the certification procedure look?

From application through plant inspection to a 3-year certificate in Polish and English.

Overview of the main stages — hover or tap a step for details.

1Application

Submit the application form with all required attachments, documents and product information.

This process ensures that products and means of transport meet high safety and quality standards, supporting access to international markets.

Documents, applications and links

Download application forms and access useful ATP reference texts to start the plant inspection process.

Forms and downloads

Online application and traditional forms for ATP plant inspection (PJI-06).

Loading documents…

Send completed documents to inspekcja@coch.pl

Fees

Information on fees for ATP plant inspection can be obtained individually. Please send your inquiry to: inspekcja@coch.pl

Appeals and complaints

Information on the complaints and appeals procedure for the Inspection Body is available here: Complaints and appeals

Application procedure

  1. 1Fill out the ATP plant inspection application (online or downloadable).
  2. 2Submit documentation to inspekcja@coch.pl.
  3. 3Agreement execution and application registration.
  4. 4On-site plant inspection and documentation assessment.
  5. 5Receive the 3-year certificate (PL + EN) and marking licence.

Need assistance?

Contact our inspection experts for guidance on scope, schedules and required attachments.

Frequently asked questions

Technical, legal and operational details regarding ATP factory audits and certification.

The offer is directed primarily to manufacturers of products covered by the ATP Agreement, in particular:

  • Manufacturers of thermally insulated means of transport — vans, bodies, semi-trailers, trailers, containers and tanks.
  • Manufacturers of mechanical cooling and/or heating appliances, including refrigeration units used in thermally insulated means of transport.

Accreditation AK 044 – PCA & ATP Inspection Body

COCH Inspection Body holds AK 044 accreditation confirming conformity to ISO/IEC 17020 for independent ATP plant assessments.

PCA AK 044

PCA · IAF MLA · ATP INSPECTION BODY

Accredited Inspection Body AK 044

As a specialised Inspection Body (AK 044) accredited in accordance with PN-EN ISO/IEC 17020, we guarantee independent quality audits, technical safety and strict compliance with international transport treaties.

Contact the Inspection Body

Direct support and coordination for ATP plant inspections and audits.

mgr inż. Miłosz Gratkowski

Head of Inspection Body

mgr inż. Bogdan Szczepański

Lead ATP Auditor

How to find us

Centralny Ośrodek Chłodnictwa „COCH”

ul. Juliusza Lea 116, 30-133 Kraków

Monday – Friday, 7:30 – 15:30

Entrance from Juliusza Lea Street. Parking available on site for clients.

Need an ATP plant inspection?

Contact the Inspection Body — we will advise on scope, documentation and next steps.